|
Post by Wyldcomfort on Mar 23, 2007 18:48:52 GMT -5
Just a heads up for folks,
An OHV Workparty is occurring on April 14th at 9:00am. T1N, R7W, sec.29 (Jordan Creek Trail)
Anyone is welcome; we'll be digging into the rock staged at the top/bottom of the trail. Our main objective is to harden failing dips, clean two bridges, add some grassgrid block, and post a junction sign. Folks will want to think about bringing something to haul rock. ODF will have 2-6x6’s, some hand tools, a broom, and staff to assist with the workparty.
What to bring: Proper Protective Equipment (boots, work cloths, eye protection, gloves, etc.), water and some snacks or lunch.
Tools needed for moving rock: Shovel, Bent Shovel, Hoe, or Pulaski, or anything you may have to disperse/dig material. The department will have some on hand as well. Please RSVP!
Equipment needed: Something able to haul rock. If someone would like to bring a piece of equipment (i.e. mini excavator, skid steer, or just anything) please contact me. Please RSVP, we’ll need to get unloaded sooner to start at nine.
How to get there: In-between mile post 18 and 19 is the Jordan Creek Rd turnoff. We’ll be at the staging area about 2miles up the road from Hwy6.
Hope to see yea at the work party,
Kelly S. Foster
OHV Program Coordinator Tillamook State Forest (503) 359-7463 Fax: (503) 357-4548 kfoster@odf.state.or.us
|
|