|
Post by Wyldcomfort on Feb 26, 2007 23:21:08 GMT -5
An OHV Work party is occurring on March 10th at 9:00am. T2N, R6W, sec.36 (Powerline Trail) Happy Meal Section
Anyone is welcome; we'll be digging into the rock staged at the top/bottom of the trail. Our main objective is to harden rolling dips and trail tread. We have one section needing fill and rehab. Folks will want to think about bringing something to haul rock. ODF will have an excavator, 1-6x6, and a rock hauler to assist with the work party.
What to bring: Proper Protective Equipment (boots, work cloths, eye protection, gloves, etc.), water and some snacks or lunch.
Tools needed for moving rock: Shovel, Bent Shovel, Hoe, or Pulaski, or anything you may have to disperse/dig material. The department will have some on hand as well. Please RSVP!
Equipment needed: Something able to haul rock. If someone would like to bring a piece of equipment (i.e. excavator, skid steer, or just anything) please contact me. Please RSVP, we’ll need to get unloaded sooner to start at nine.
How to get there: Head west on Hwy6 and turn at the Summit onto Beaver Dam Rd. Follow Beaver Dam Rd. to the first right (U-Falls Rd) and stay right across the wood bridge. You’ll see us at the start of the trail at the top of the hill.
|
|